Project Overview

The Hongqiao Raw Water Pumping Station Project is a key component of the Shanghai Raw Water Western Ring (South Section) Project. It improves Shanghai's raw water supply network through interconnection, mutual support and coordinated operation, enhancing reliability, flexibility and emergency response while strengthening links between the Qingcaosha Water Source and the upstream Huangpu River system.

Project Highlights

The project includes a new raw water transmission pipeline and pumping station with a designed capacity of 1.2 million m³/day. It includes approximately 19 km of DN3000 pipeline and supporting valve chambers. The station has eight horizontal centrifugal pump units (six operating and two standby) and a total building area of approximately 6,432.71 m², including 4,198.77 m² above ground and 2,233.94 m² underground.

KAIYI's Contribution

KAIYI provided professional pipeline solutions and quality products to project requirements. Experience in large municipal water infrastructure, strict quality control and reliable delivery supported successful implementation and the development of Shanghai's modern raw water supply system.

Products Supplied

  • Large Diameter Steel Pipes
  • Special-Shaped Steel Pipes
  • Pipe Fittings
  • Expansion Joints
  • Reducers
  • Valves and Pipeline Components

Our Commitment

KAIYI always adheres to the philosophy of “Scientific Management, Honest Operation, Quality Assurance.” With reliable products, professional technical support and comprehensive pipeline solutions, KAIYI supports water supply, municipal infrastructure and engineering projects worldwide.

Project Gallery

Hongqiao Raw Water Pumping Station Project 2
Hongqiao Raw Water Pumping Station Project 3
Hongqiao Raw Water Pumping Station Project 4
Hongqiao Raw Water Pumping Station Project 5
Hongqiao Raw Water Pumping Station Project 6
Hongqiao Raw Water Pumping Station Project 7